Consulting Ciech SODA
Development of a detailed investor's cost estimate together with a concept for the project "Construction of a gas turbine with an electrical output of 17.5MWe together with a waste-heat boiler with a steam output of 27 t/h (t=465°C, p=73bar) and a natural gas-fired steam boiler of 45 t/h (t=465°C, p=73bar) at the site of Ciech Soda Polska S.A." Production Plant in Inowrocław also referred to as the construction of the Combined Cycle Power Plant (CCPP)