Investor

Tauron

Contractor

Econstruction sp. z o.o.

Project value

5 700 000 PLN

Completion time

2020 – 2022 r.

Construction works for a 2x2.27 MW high-efficiency contenerised cogeneration plant

Scope of works

  • Design and development of complete technical and technological documentation
  • Construction of a new combined heat and power (CHP) plant with adaptation for 2 gas engines and system feed including technology:
    • 2 Jenbacher gas engines 2x2.7 MW o Construction of a 2.7 km gas pipeline between Brzeszcze and Jawiszowice
    • Supply and installation of heat exchangers, flue gas ducts, silencers, fan coolers
  • Modernisation of the power supply zone of the existing CHP plant including replacement of medium and low-voltage bays, supply of transformers, construction of a new switchgear and evacuation of electrical power,
  • Control and instrumentation - Connection to the master system
  • Technical and technological commissioning of the installation.