Construction of a high-efficiency cogeneration unit
- Design documentation, including building design, detailed designs, along with all arrangements, opinions, and reports required by law.
- Execution of earthworks, foundation works and construction of the electrical building and pumping station building
- Construction of a heat removal system from cogeneration units
- Installation of a gas connection for CHP units
- Supply and installation of flue gas removal system
- Supply, installation and commissioning of MV and LV switchgears and distribution boards
- Construction of a power take-off system from cogeneration units including construction of an SN15kV cable line (3.2 km)
- Supply, installation and commissioning of three gas-fired cogeneration engines in containers.
- Site development
- Commissioning of facility, training of operators
- As-built documentation.
- Obtaining of all necessary, final, legally valid decisions and permits, including the use permit.
- Warranty service