Turnkey construction of a flue gas treatment plant
- Design documentation, including detailed designs, along with all arrangements, opinions, and reports required by law.
- Demolition of some existing facilities
- Foundations
- Prefabrication, delivery, and construction of flue gas treatment plant (dust removal plant, flue gas desulphurisation and denitrification plant), including site development.
- Supply, installation, and start-up of power-supply and control systems as part of the flue gas treatment plant
- Installation and configuration of a software for control of the flue gas treatment plant operations including utility software to enable control, visualisation, diagnostics, troubleshooting, modification, and development of control software.
- Start-up of the flue gas treatment plant
- Obtaining of all necessary, final, legally valid decisions and permits, including the use permit.
- As-built documentation.
- Warranty service

s

s

s

s3