Construction of a high-efficiency cogeneration unit
- Cogeneration 2x CHP units with a total capacity of 8.8 MWe / 8 Mwt
- Boiler room: 3 Gas-Fired Water Boilers with a total capacity of 8.1 MWt
- Heating water pump station
- Water treatment station
- Electrical system including power evacuation
- Gas system including gas preparation plant
- Auxiliary system