Construction works for a 2x2.27 MW high-efficiency contenerised cogeneration plant
- Design and development of complete technical and technological documentation
- Construction of a new combined heat and power (CHP) plant with adaptation for 2 gas engines and system feed including technology:
- 2 Jenbacher gas engines 2x2.7 MW o Construction of a 2.7 km gas pipeline between Brzeszcze and Jawiszowice
- Supply and installation of heat exchangers, flue gas ducts, silencers, fan coolers
- Modernisation of the power supply zone of the existing CHP plant including replacement of medium and low-voltage bays, supply of transformers, construction of a new switchgear and evacuation of electrical power,
- Control and instrumentation - Connection to the master system
- Technical and technological commissioning of the installation.