Construction of a flue gas desulphurisation plant at POMORZANY CHP
- Laying of SN cables from OE switchgear to 1.6 MVA transformers – 2 pcs. and 1 MVA transformer -1 pc.
- Supply and installation of 1.6 MVA – 2 pcs. and 1 MVA - 1 pc transformers
- Supply and installation of LV double-section BFA 3200A switchgear
- Installation of cable routes in the desulphurisation building
- Installation of basic and emergency lighting in the desulphurisation building
- Laying of supply and control cables to process equipment in the desulphurisation building
- Provision of heating system for the process equipment and pipelines arranged on pipe
- Lightning protection and equipotential bonding in the technical building
- Lightning protection and equipotential bonding for pipe racks
- Expansion of the ECONTROL system
Comprehensive scope of electrical works