Construction of a gas unit with waste-heat boiler
- Design, construction, start-up and commissioning of a new gas-fired combined heat and power plant based on a Kawasaki gas turbine
- 8 MWe gas turbine unit
- Waste-heat boiler with a capacity of 12 MWt
- Electrical system including 110kV power evacuation
- Gas system including gas preparation plant
- Heat evacuation systems
- Auxiliary systems
- Gas turbine service agreement (LTSA) for 5 years